Civil Works for the Construction of the New Apron – E Fuel Hydrant System at Bandaranaike International Airport, Sri Lanka

The civil engineering scope of this project involved comprehensive groundwork and infrastructure development to support the installation of the New Apron – E Fuel Hydrant System. The scope encompassed excavation, foundation works, trenching, backfilling, and surface reinstatement to ensure smooth integration with the airport’s existing facilities.

Completed in 2022, the project was commissioned by the Ceylon Petroleum Corporation Sri Lanka and executed by the main contractor, China National Chemical Engineering No. 14 Construction Co. Ltd.

  • Excavation and Foundation Works
  • Trenching and Pipeline Accommodation
  • Backfilling and Soil Compaction
  • Surface Reinstatement for Apron Integration
Pattern Bg

Project Info

  • Location

    Bandaranaike International Airport, Sri Lanka
  • Project Scope

    The civil scope included constructing and preparing the infrastructure to accommodate the fuel hydrant system, ensuring durability, reliability, and compliance with global aviation standards.
  • Project Objective

    To develop a robust civil infrastructure that supports the seamless installation and operation of the fuel hydrant system, enhancing the overall capacity of BIA to meet increasing aviation demands.
  • Project Year

    2022
  • Client

    Ceylon Petroleum Corporation Sri Lanka

    Main Contractor

    China National Chemical Engineering No. 14 Construction Co. Ltd